Chapter Hangar is Currently: OCCUPIED

If you are in need of hangar space please let the chapter officers know. The Chapter hangar may be available for anyone who’s been a Chapter 301 member for at least 1 year and building or in final assembly of your experimental or light sport aircraft.

Hangar details: T-Hanger at Colorado Air and Space Port (KCFO). Heated and insulated. Adjacent to restroom with shower. Several chapter members nearby for help.

$300/mo (when available)

If you would like to know more about renting it and moving into the hangar just talk to:

Chapter President

Available Tools

Tools are available to Chapter Members. If you need to check out a tool for your project please contact the tool custodian directly.

Tool Custodian
Randall Eaker

Tool List

Airframe
Nicopress sleeve tool 53XPJ with gauge
Nicopress sleeve tool 64CGMP without gauge
De-burring tool
Hole flanger - sheet metal
Electrical connector squeezers
Panel knock-out punches
Rivet squeezer - w/two new die sets
Torque wrenches (2), (large and small)
Hose clamp pliers
Tubular rivet set for 1/8” rivets
Drill guide for drilling cotter pin holes through bolts
3x pneumatic rivet gun
90 deg.pneumatic drill size 30 bit only.
air blower gun
1/4 inch hose mandrel
Pneumatic blind rivet puller
High voltage wire tester

Scales
Aircraft Spruce type
Electronic/strain gauge type
(7) - 50 LB cast iron slugs for calibration

Fire Wall Forward
Oil filter cutter
Tubing beaders: 3/8” & 1/2”
Tubing bender
Continental engine valve lifter tool
Magneto timer
Top dead center finder
Tube flaring tool
1/2” cylinder wrench. 9/16” cylinder wrench
Compression tester
Bore scope
Pliers, hose spring clamp
Temperature measuring device (wide range)
Prop Balancer

Chapter Hangar Gallery